General Motors Plant at Talegaon:


Dramatic effect of Precast Prestressed Concrete large spans and heavy loading was demonstrated in construction of Paint Shop for General Motors. 1,50,000 Sq.ft of floor area was designed, manufactured and erected for a live load of 750 Kg/m2 and point load of 3T in less than 3 months. Concrete T Slabs and IT Beams were designed for heavy industrial loadings for spans upto 18 months.                          
Client: Shapoorji Pallonji Limited on behalf of General Motors.